Practical answers for schools, landlords, occupiers, managing agents and project teams planning refurbishment, fit-out and compliance work.
Five practical guides for planning your project
Start with the decisions that shape the scope, quotation and programme. These guides bring together practical project questions, KRP’s published project examples and links to independent guidance. Every building needs its own assessment.
What affects office fit-out cost?
A useful budget starts with the required outcome and the condition of the building. Floor area helps describe a project, but a rate per square metre will only be meaningful when the inclusions are clear.
Separate the main cost decisions
Existing condition: what can be retained, what needs repair and what must be removed?
Layout: how many enclosed rooms, meeting spaces, reception areas and shared facilities are needed?
Services: what changes are required to power, lighting, ventilation, heating, cooling and data?
Specification: what finish, durability and acoustic performance does each space need?
Delivery: can the site be cleared, or must works be phased around occupants and restricted hours?
Furniture, IT equipment, professional fees, approvals and VAT should be identified separately when comparing proposals. Ask each bidder to show exclusions and provisional allowances. An apparently cheaper quotation may cover a different package.
RICS identifies cooling, audiovisual systems, IT and higher-specification meeting spaces as cost drivers in current office fit-outs. See its fit-out sector analysis.
KRP example: the published Staple House project in Winchester describes CAT A refurbishment across three floors. Its scope provides useful context when discussing a project; it is not a price benchmark for a differently specified building.
What should you prepare for a refurbishment quotation?
Give contractors the same brief so you can compare like for like. A short, organised information pack is more useful than a long wish list with unclear priorities.
Property details: address, building use, approximate work areas and a contact for access.
Required outcome: describe the problem to solve and which areas are included.
Existing information: relevant drawings, surveys, service records and known building constraints.
Specification: required layouts, fittings and finishes, with any items still to be selected clearly marked.
Responsibilities: identify who will handle design, approvals, specialist equipment and landlord liaison.
Programme and budget: provide the target date, the reason it matters and the available budget range if known.
Ask the quotation to distinguish defined work, assumptions, exclusions and allowances. Agree how changes will be priced and approved before work starts. A fixed quotation relates to a defined scope; an incomplete brief still leaves decisions to resolve.
Commercial clients also have project-management duties under CDM 2015. Early planning and suitable appointments matter from the start; see HSE’s commercial-client guidance.
Can refurbishment take place while a building stays open?
Sometimes, but the layout and work scope must support a workable separation between construction and normal use. A phased programme should say which spaces stay available, when they change and how each phase is handed back.
Questions to resolve before agreeing the programme
Can occupants reach the facilities they need without passing through work areas?
Which activities create noise, dust, vibration or service interruptions?
Where will materials, waste and deliveries move through the site?
Which operations need an agreed shutdown or a temporary relocation?
Who tells staff, visitors and neighbouring occupiers about changes?
What checks are needed before an area reopens?
HSE highlights boundaries, controlled access and managing hazards to people outside the work area in its guidance on protecting the public. The project team should turn these principles into arrangements suited to the actual site and its users.
Out-of-hours working may help with selected activities, but it can affect cost, supervision, access and sequencing. Compare a fully cleared site with a phased option before assuming that keeping every area open is the best solution.
How should a commercial washroom refurbishment be planned?
Start with the people using the building and the facilities they will need throughout the works. Replacing finishes and fittings is only part of the brief: services, access, maintenance and temporary arrangements also need decisions.
Assess the existing space: record the layout, condition and known issues with drainage, plumbing, ventilation and electrical services.
Confirm the requirements: discuss user numbers, accessibility, cleaning, durability and the intended specification with the appropriate project specialists.
Choose a phasing plan: establish which facilities can remain available and whether temporary provision or a closure is needed.
Coordinate the package: agree the interfaces between service alterations, cubicles, sanitaryware, flooring, wall finishes and ceilings.
Plan reopening: allow for checks, cleaning, snagging and handover information before returning the area to use.
HSE explains employers’ responsibilities for suitable welfare facilities, including toilets and washing facilities, in its workplace-facilities guidance. The appropriate provision and design depend on the building and its users.
KRP example: the BH Live work in Portsmouth and Southsea included renewal of male and female changing facilities within a wider refurbishment package. See the published project scope and photographs for the work delivered.
The construction period is only one part of the time needed to deliver a project. A useful programme also allows for surveys, design decisions, approvals where required, procurement, access arrangements and handover.
Work backwards from the required outcome
Identify the date the space must be usable and the reason for that deadline. Then check the decisions and dependencies that must be resolved before work can begin. Long-lead products, service shutdowns, specialist attendance and occupied areas can determine the sequence.
Separate target dates from confirmed commitments.
List outstanding client selections and the dates they are needed.
Identify which tasks rely on earlier work being complete.
Include inspections, testing where applicable, cleaning and snagging.
Agree how the programme will be reviewed when the scope or site conditions change.
KRP’s published projects illustrate why scope matters: Staple House records a 12-week programme, while the Chichester commercial refurbishment records four weeks. These are individual project histories, not promised durations for future work.
Ask for a programme tied to your surveyed scope and access arrangements. A credible completion date should explain its assumptions and the decisions needed to maintain it.
Published 4 October 2026. General project-planning information; the specification, responsibilities and programme for your property are agreed following assessment.
Expert answer centre
Plan a better-managed project
These answers explain how KRP approaches scope, pricing, programming and live-building constraints. Every project still requires its own survey and agreed brief.
Cost depends on the building’s condition, size, specification, structural work, services, access and programme. KRP surveys the site and defines the scope before providing a fixed-price quotation.
The programme depends on floor area, specification, services, approvals and whether the building remains occupied. KRP’s Winchester case study covered three floors of CAT A office space over a phased 12-week programme.
Where the scope and safety controls allow, work can be phased around the school day and holiday periods. Site segregation, safeguarding and access arrangements are agreed with school leadership before work begins.
When should a school appoint a contractor for a CIF project?
CIF projects operate to fixed funding and delivery windows, so early surveys and costed proposals help schools prepare before funding decisions and mobilise quickly after an award. KRP supports both costed proposals and project delivery.
A project may include strip-out, structural alteration, internal reconfiguration, access changes, mechanical and electrical upgrades, fire separation, finishes and external improvements. The final scope is defined around the existing building and its intended use.
KRP begins with an operational briefing covering occupied areas, critical access, working-hour constraints and building users. The programme can then define work zones, segregation, deliveries, disruptive activities and phased handovers.
What does CDM 2015 mean for a refurbishment project?
CDM 2015 establishes duties for clients, designers and contractors to plan and manage health and safety throughout a construction project. The precise appointments and responsibilities depend on the project and procurement route.
What information is needed for a fixed-price quotation?
A useful starting brief includes the building location, intended outcome, available drawings or surveys, required completion date, occupancy constraints, specification expectations and any known structural, services or compliance issues. A site survey is then used to confirm the scope.
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional
Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes.The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.